Skip to content
No results
  • News
  • Events
  • Projects
  • Business
  • Partner cities
    • Chattanooga, United States of America
    • Montabaur, Federal Republic of Germany
    • Gennevilliers, French Republic
    • Comune di Silvi, Italian Republic
    • Bystřice nad Pernštejnem, Czech Republic
    • Gmina Boguchwała, Republic of Poland
    • Gmina Kożuchów, Republic of Poland
  • Friendly municipalities
    • Cities of Marlow and Rugby, United Kingdom
    • Valmiera, Republic of Latvia
    • Kashihara, Japan
  • Industrial Park
  • Steel Dream
  • Interview
  • Friends
  • Publications
  • Master plan
  • Trostyanets city hromada
  • Editorial Policy
  • Trostyanets City Council
Trostyanets

Development of Global Partnerships

Login
Partners
  • News
  • Events
  • Projects
  • Business
  • Partner cities
    • Chattanooga, United States of America
    • Montabaur, Federal Republic of Germany
    • Gennevilliers, French Republic
    • Comune di Silvi, Italian Republic
    • Bystřice nad Pernštejnem, Czech Republic
    • Gmina Boguchwała, Republic of Poland
    • Gmina Kożuchów, Republic of Poland
  • Friendly municipalities
    • Cities of Marlow and Rugby, United Kingdom
    • Valmiera, Republic of Latvia
    • Kashihara, Japan
  • Industrial Park
  • Steel Dream
  • Interview
  • Friends
  • Publications
  • Master plan
Trostyanets

Development of Global Partnerships

Arrangement of a high-quality water supply system in Trostyanets municipality

  • Avatar photoMaksym Syniavin
  • 10.05.2025
  • Projects

    The proposed project includes a full range of works to be performed for the construction of a deep-water well with a pumping station. The technical part of the project envisages providing water supply to the western part of Trostyanets, which is currently carried out using only one 110-meter deep water intake well.

    The well has been repeatedly repaired and is not reliable in operation. The quality of water from the aquifer does not meet the standard “Hygienic requirements for the quality of drinking water intended for human consumption” in terms of iron compounds.

    There are no backup wells with quality water, so the only option to solve the issue of providing the population with quality drinking water is to build a new water intake well.

    The goal of the project is to provide quality drinking water to the western part of Trostyanets by constructing a new water intake well that will meet basic sanitary standards.

    Project goals:

    • Construction of a new water intake well in the Cenomanian-Lower Cretaceous aquifer.
    • Ensuring reliable and high-quality water supply to the western part of Trostyanets.
    • Ensuring that the water quality meets the requirements of hygiene standards.
    • Improving the living conditions and health of the city’s residents by providing access to quality drinking water.

    The target audience of the project:

    • Residents of the western part of Trostyanets – 11200 people.
    • Residents of the IDP settlement in the Neskuchne tract – 100 people.
    • Local government, which is directly interested in improving the city’s infrastructure and providing comfortable conditions for residents.
    • Educational institutions, hospitals, businesses and other institutions that need reliable access to quality drinking water for their operations – 2000 people.

    Project objectives

    • drilling an exploration and production well with a depth of 810 meters;
    • construction of an underground pumping station above the well;
    • equipping the well with pumping equipment;
    • organization of improvement of the first sanitary protection zone;
    • installation of power electrical equipment.

    Expected results of the project:

    • Providing the population with quality drinking water.
    • Reducing the risk of diseases associated with the consumption of unfit water.
    • Increasing the level of comfort and meeting the basic needs of residents.
    • Improving the city’s water supply infrastructure.

    Project budget (taking into account the Euro exchange rate as of May 20, 2024 – 42.7549)

    №NameCost, UAHCost, EUR
    1Preparatory works142 610,003 335,52
    2Construction of an artesian well11 223 757,00262 513,93
    3Power supply and automation of pumping equipment372 616,008 715,16
    4Other works and expenses755 941,0017 680,80
    5Engineering services121 720,002 846,93
    6Author’s supervision and design works245 090,005 732,44
    7Administrative expenses91 050,002 129,58
    8Risks of construction participants310 470,007 261,62
    9Inflation risk coverage1 435 290,0033 570,18
     Total14 698 544,00343 786,19
    Tags
    # water supply system
    Share on Facebook Share on X (Twitter) Share on Telegram
    Avatar photo
    Maksym Syniavin

    Deputy Mayor for Regional Development, Project Activities, International Cooperation, Urban Planning, Architecture, and State Architectural and Construction Control. He graduated from the National Technical University “Kharkiv Polytechnic Institute” with a degree in Economics and Entrepreneurship and received the qualification of economist.
    He started his professional career at the Trostyanets City Council in 2007. He worked in the areas of consumer rights protection, entrepreneurship and trade development.
    In 2015–2017, he headed the Department of Urban Planning, Architecture, Construction, communal services, and Improvement of the city council.
    In his professional activity, he combines a strategic vision for territorial development, a practical approach to project implementation, experience in international cooperation, and a deep understanding of the community’s needs.

    Articles: 23

    NGO “Camino” improve the quality of water supply and energy independence of municipality’s water intakes

    our partners

    • Video
    • Documents

    • Trostyanets city hromada
    • Editorial Policy
    • Trostyanets City Council

    Municipal web-portal "Global Trostyanets" of Trostyanets city hromada was founded in May 2026 as a quick response and gratitude to all our international partners who helped our hromada survive after the occupation in 2022 and develop today. To some extent, this is a unique web resource, which has no analogues in Ukraine.

    Trostyanets is becoming an example of high-quality reconstruction and resilience. Financial support from the state and international partners has given us the chance to restore the housing stock, equip premises for the accommodation of displaced persons, create modern medical institutions, launch the educational process, revive and develop the municipal sphere.

    Today we have already demonstrated that restoration is not only about rebuilding buildings. It is the path to a qualitatively new level of life for municipality! We have become an example for the country and a convincing signal for foreign donors: aid brings tangible changes.

    Contact information

    • Opening hours: 9AM - 5PM
    • Website: Trostyanets City Council, Ukraine
    • Address: 42600, Trostyanets city, Myru str., 6
    • Email: mail@trostyanets-miskrada.gov.ua
    • Telephone: +380 545 85 13 80

    Copyright © 2026 - Global Trostyanets