Within the city of Trostyanets there is a land plot cadastral number 5925082700:00:003:0034 with an area of 11.2594 hectares on which a brick factory is located.
The territory of the factory is partially asphalted and fenced. Engineering communications are connected: water, electricity, its own electrical substation with a capacity of 400 kW with a 100% reserve. The source of water supply is a well with a depth of 100 m and the Rozhnovsky Tower with a volume of 25 m³. At a distance of 10 m from the border of the site there is a medium-pressure gas pipeline (diameter 100 mm, pressure 0.5 kgf / cm²).
The facility has a convenient transport location: 2 km from the city center, nearby the national road N-12 Sumy–Poltava and the Sumy–Kharkiv highway, as well as 4.1 km from the Trostyanets-Smorodino railway station. The proximity of the quarry, the presence of transport highways and engineering infrastructure make the facility attractive for the resumption of brick production.
Production potential: total area of buildings 3274.1 m² (domestic two-story building — 356 m² (new roof, windows, doors), ring kiln — 1215 m² (needs major repairs), brick factory building — 1282.7 m² (needs major repairs), utility rooms — 420.1 m².)
Raw material base: nearby land plot (cadastral number 5925082700:00:003:0206, area 37.3773 ha) with promising reserves of loam with a volume of 969 m³ for brick production.

Investing in brick production is a highly lucrative opportunity, driven by booming construction, infrastructure growth, and urbanization. Profit margins are solid, but success requires significant capital for heavy machinery, utility infrastructure, and raw materials.
The project for the construction of a brick factory with a capacity of 25 million bricks per year involves an investment of 65 million UAH, with a payback period of 9 years and a profitability of 11.5%. The construction of the brick factory will create 100 jobs and require a land plot of 5 hectares near a clay deposit. The relatively low cost of brick production will ensure competitiveness in the market.
INVESTMENT PROJECT
Construction of a brick factory with a capacity of 25 million bricks per year.
FINANCIAL INDICATORS:
- Investment Amount: 65 million UAH
- Profitability: 11.5%
- Payback Period: 9 years
- Jobs Created: 100
- Approximate Land Area Required: 11,3 hectares
KEY INDICATORS:
- Cost of 1,000 bricks: 1,800 UAH
- Total production cost of 1,000 bricks: 1,500 UAH
A clay deposit near the factory is necessary for construction.